These photos represent the construction and completion of a high end pier project where our construction crew built the main pier, added a new two-piece floating dock and decked the entire project with Ipe hardwood decking and handrail cap. This project was unique due to the fact that it required a gentle slope in the main run to accommodate the change in elevation instead of stairs.